A permeable parking lot in Revin, in the French Ardennes, by Eiffage Route

Our teams are constructing a 2,200 m² permeable parking area with 1,300 m² of roadway, addressing the environmental challenges of our client Cibox, a company specializing in micro-mobility.

A permeable parking lot in Revin, in the French Ardennes, by Eiffage Route

This project in numbers:

  • 10,000 m³ of earthworks
  • 9,200 m² of GB5
  • 2,700 m of dry utility trenches
  • 1,700 m of sewer networks, including 900 m made with recycled materials
  • 2,500 m of poured curbs

Congratulations to the Eiffage Route teams on site!

Expected completion: End of November 2024

Project Manager: Végétude